Day 38

 

8 August 2020

Fresh Paint

 

In Staten Island the first coat of red paint is on the hull, Ron painted bitts, Jack, Mike, and Barry wired up the aircraft warning lights at the top of the mast, side light connections, we pressure washed both sides of the superstructure, and the second coat of paint on the black boot top on the hull was applied.

Up in Albany, the crew primed all the mooring bollards. Danny straightened out the handicap ramp rail. They patched hole in trailer roof that had leaked into gift shop. And they laid out installed new anchor point cleat studs in the sea wall cap for new safety net as well as fabricating a safety net cleat. Tony Esposito brought them donuts to keep them motivated.